The ABC-Halbinsel is an offshore terminal operated by BLG LOGISTICS GROUP/ WindEnergy Logistics. It is located between Kaiserhafen II and III, next to the car terminal.
Here you will find ship mooring areas as well as storage areas prepared for heavy load to store foundation structures and large components of offshore wind turbines. Equipment and replacement parts for service and maintenance at sea can be stored safely and close by as well.
The 900-metre quay and a dock with a depth of 10.5 meters allow even installation vessels to jack up.
Access is via the 305 by 55 meter Kaiserschleuse lock.
BLG LOGISTICS GROUP/ WindEnergy Logistics
Carsten Rogge
Tel: +49 (0)471 - 484 4183
Fax: +49 (0)471 - 484 4106
croggeilusdhfshsdfoasdguzkihblg.de
www.blg.de
- BLG LOGISTICS at the Breakbulk in Antwerp (8th of May 2014)
- Technological edge through innovation (11th of March 2014)
- New offshore jack-up vessel VIDAR commissioned in Bremerhaven (12th of December 2013)
- BLG WindEnergy establishes contacts to Japan (16th of October 2013)
- Stars for Global Tech I come from Wilhelmshaven (5th of September 2013)
- First tower sections and nacelles for Global Tech 1 Wind Farm (16th of August 2013)
- BLG at International Green Energy Expo ? Wind Power Korea (2nd of April 2013)
- Crane vessel STANISLAV YUDIN loads tripods in Bremerhaven (5th of March 2013)
- Travel by double-decker bus through the Offshore Terminal ABC-Halbinsel
- BLG LOGISTICS GROUP / WindEnergy Logistics